Publicação
Uniformity microsprinkler irrigation system using statistical quality control
| Resumo: | ABSTRACT: The objective of this study was to evaluate the use of statistical quality control tools in the analysis of the uniformity of a microsprinkler irrigation system. For the analysis of irrigation Christiansen uniformity coefficient (CUC) and the distribution uniformity coefficient (DU) were statistically analyzed by means of the Shewhart control charts and process capability index (Cp). For the experiment 25 tests were carried out with a single micro sprinkler and subsequently seven different spacing between micro sprinklers were simulated. Control charts contributed to the diagnosis of the treatments to be under control and with satisfactory uniformity outcomes. Increase in process capability index was directly proportional to the average of CUC and DU. |
|---|---|
| Autores principais: | Andrade,Maurício Guy de |
| Outros Autores: | Boas,Marcio Antonio Vilas; Siqueira,Jair Antonio Cruz; Sato,Mireille; Dieter,Jonathan; Hermes,Eliane; Mercante,Erivelto |
| Assunto: | Christiansen uniformity coefficient distribution uniformity coefficient control charts process capability index |
| Ano: | 2017 |
| País: | Brasil |
| Tipo de documento: | artigo |
| Tipo de acesso: | acesso aberto |
| Instituição associada: | IBICT |
| Idioma: | inglês |
| Origem: | Oasisbr |
| Resumo: | ABSTRACT: The objective of this study was to evaluate the use of statistical quality control tools in the analysis of the uniformity of a microsprinkler irrigation system. For the analysis of irrigation Christiansen uniformity coefficient (CUC) and the distribution uniformity coefficient (DU) were statistically analyzed by means of the Shewhart control charts and process capability index (Cp). For the experiment 25 tests were carried out with a single micro sprinkler and subsequently seven different spacing between micro sprinklers were simulated. Control charts contributed to the diagnosis of the treatments to be under control and with satisfactory uniformity outcomes. Increase in process capability index was directly proportional to the average of CUC and DU. |
|---|
Atividades financiadas
Não foram encontrados projetos financiados.