Publicação

Enhanced UMTS Cost/Revenue Optimisation in Offices Scenarios

Ver documento

Detalhes bibliográficos
Resumo:In this paper Enhanced UMTS offices scenarios and classes of services up to wideband are taken into account. A model is proposed for optimising Enhanced UMTS based in costs and revenues. A system level simulator is used to obtain the blocking probability, and other QoS measures, e.g., handover failure probability and delay. Using these results, one obtains the system capacity, i.e., the supported fraction of active users and throughput for a given grade of service. The profit (in percentage) was obtained, and the optimum (most profitable) cell radius was found. A higher number of pico-cells (with a cell radius around 34 m) will be a profitable solution for the optimisation of network planning. This will also allow for increasing system capacity and reducing prices.
Autores principais:Cabral, Orlando Manuel Brito
Outros Autores:Velez, Fernando José; Hadjipollas, George; Stylianou, Marinos; Antoniou, Josephine; Vassiliou, Vasilis; Pitsillides, Andreas
Assunto:Enhanced UMTS Economic aspects Offices scenario Optimisation Profit
Ano:2005
País:Portugal
Tipo de documento:documento de conferência
Tipo de acesso:acesso aberto
Instituição associada:Universidade da Beira Interior
Idioma:inglês
Origem:uBibliorum
Descrição
Resumo:In this paper Enhanced UMTS offices scenarios and classes of services up to wideband are taken into account. A model is proposed for optimising Enhanced UMTS based in costs and revenues. A system level simulator is used to obtain the blocking probability, and other QoS measures, e.g., handover failure probability and delay. Using these results, one obtains the system capacity, i.e., the supported fraction of active users and throughput for a given grade of service. The profit (in percentage) was obtained, and the optimum (most profitable) cell radius was found. A higher number of pico-cells (with a cell radius around 34 m) will be a profitable solution for the optimisation of network planning. This will also allow for increasing system capacity and reducing prices.

Atividades financiadas

Carregando projetos financiados...